Hull Efficiency Recovery, Redefined · A Strategic Initiative by Ultranav

Hull Efficiency.
Recovered.
In 2 Days.

A mid-cycle PitStop in Tenerife — hull repaint and ESD installation in a single 48-hour stop, between standard dry-dockings. No weeks of off-hire.

02
Days Average Service
14,000
Coating Capacity
Tenerife
Canary Islands

What is Marine PitStop

A Dry Dock Built for One Thing

Marine PitStop is the first floating dry dock in the Atlantic dedicated exclusively to mid-cycle hull coating and ESD installation. No repairs. No general yard work. Just hull — and we do it in 48 hours.

Mid-Cycle, Not Class-Dock
Sit between standard 30–60 month dry-dockings. No survey lock-in.
Purpose-Built Facility
22,000 TLC floating dock, robotics, AI scanning — designed for speed, not retrofitted from a repair yard.
48-Hour Turnaround
4h inspection + 24h prep + 20h coating. Cured and back in service.
Floating Dry Dock
22,000 TLC · Up to 230m LOA · Tenerife, Canary Islands

The Status Quo

The industry standard is 5–7 days off-hire. We do it in 2.

Traditional dry-dockings tie vessels up for weeks. Repair yards aren't built for paint speed. Hull efficiency silently degrades between class surveys — and bunker costs keep climbing.

Inside the PitStop

The 48-Hour Process

Three engineered steps — from AI inspection to fully cured antifouling, in a single 48-hour window

Step 01
4 h

Inspection & Diagnosis

Image capture with AI recognition identifies fouling type and severity, reduces inspection time, and produces a recommended paint job and automated cost estimation in real time.

Image capture + AI Inspection time reduction Recommended paint job Automated cost estimation
Step 02
24 h

Cleaning & Hydroblasting

Precision cleaning and hydroblasting using Hydwin robots, Hammelmann pumps and on-site experts. Maximum surface prep with minimum downtime — eco-friendly waste capture included.

Precision cleaning Hull protection Minimized downtime Eco-friendly
Step 03
20 h

Coating & Curing

Coating applied in record time by robots covering large areas at a fraction of standard time. Certified fast-curing schemes — developed through R&D with paint suppliers — deliver shipyard-backed application and warranty.

Robotic application Certified fast-cure Shipyard warranty Lab-tested
Total dock time 4 h + 24 h + 20 h = 48 h

Who It's For

Built for Operators Who Count Days

If off-hire is a line item on your P&L, this service is for you.

Shipowners

Recover hull efficiency between class-dockings — without losing weeks of trading.

Ship Managers

Predictable 48-hour windows. No yard schedule risk. Quote to invoice in days.

Charter Operators

Maintain fuel performance under TC commitments. Bunker savings stay yours.

Technical Superintendents

AI-backed condition reports. Certified fast-cure schemes. Shipyard warranty.

Services

Our Services

Three PitStop tiers — focused entirely on the Obra Viva, where fuel savings are made

Light PitStop

High-pressure wash and spot touch-up for hulls in good condition. Fastest turnaround, minimal prep.

Medium PitStop

Spot blasting and selective recoating for hulls with moderate fouling or localized coating breakdown.

Full PitStop

Full Sa 2.5 blasting and complete antifouling renewal for heavily fouled or aged hulls.

Advantages

Why Marine PitStop

Speed

2-day average vs. industry standard 5–7 days. Less off-hire. More revenue.

Location

Tenerife — strategic Atlantic crossroads on major Europe–Americas shipping lanes.

Technology

Latest antifouling systems. Energy saving devices. Measurable, guaranteed savings.

Backed By · Industry Leader + Engineering Expert

Ultranav
400+ vessels

Leading international shipping company operating 400+ vessels — strong capabilities in tanker, dry bulk and specialized maritime logistics, focused on efficiency, safety and operational excellence.

Hidramar Group
Shipyard expertise

Specialized shipyard group with deep expertise in ship repair, maintenance and retrofitting — strategically positioned to support mid-cycle interventions, coatings, blasting and efficiency upgrades.

Recent Work

Vessels Through Our Dock

A selection of recent hull coating projects

2024
Bulk Carrier · 82,000 DWT

MV Cabo Verde

Obra Viva + Boot Top

2d
days in dock
420 T/yr
fuel saved
2024
VLCC Tanker · 298,000 DWT

MV Gran Atlántico

Full Hull Coating

2d
days in dock
1,840 T/yr
fuel saved
2025
Container · 41,000 DWT

MV Canary Express

Obra Viva + Deck

2d
days in dock
280 T/yr
fuel saved

"In and out in 48 hours. The vessel was back trading by Wednesday — that's a number we can put straight on the P&L."

MH
Captain M. Herrera
Technical Superintendent · Atlantic Bulk Operator

Location

Tenerife, Canary Islands

Strategically located in the Port of Santa Cruz de Tenerife, at the crossroads of Europe, the Americas, and Africa, our floating dock provides unparalleled access to one of the world's busiest shipping corridors while delivering the world's fastest hull coating service. By minimizing vessel downtime and accelerating turnaround times, we help shipowners maximize fleet availability and operational efficiency.

230.0 m
Max LOA
32.5 m
Max Beam
7.1 m
Max Draft

TENERIFE · 28°N 16°W

Ready to Book Your Slot?

Get an instant quote in under 5 minutes.

Open Calculator